BranchenProdukte Production Kompetenzen

Design and construction of test benches - development & end of line test benches

Test benches processing at hofer means not only construction on behalf of the customers, but also bench test operation and components testing on site. Our experiences allow us to provide smooth operation from the beginning on, even by new developments. At the same time, convenience for the customer and the documentation of research results  are constantly kept track on.

Close interconnection of test bench construction and development support to OEMs results in rapid provision of testing high-tech in the course of product development.

hofer has been successfully using PC-based controls for its test bench concepts. On the hardware and software side is therefore the large scale Windows environment  available. Thus even years later adapting to new tests is possible.

hofer development test benches:

Test benches for MT

Test benches for AMT

Test benches for AT

Test benches for CVT

Test benches for DCT

Test benches for electric drives

Test benches for engine tests

Hot/cold test benches



Go to
3-drive Test Bench HAP01 | 3-drive test bench HAP02 | 3-drive test rig HAP05 | 4-drive test rig HAP06 | Climate chamber | Dynamometer | Function-load test bench | HIL Test Bench | Hydraulic Hot Test Bench HPP01 | Load Test Bench 1 | Load Test Bench 2 | Modular Test Field HMP | Start-Up-Test Bench | Swivel-Test Bench | Oil Flow Simulation | Test Benches for AT | Test Benches for Electric Drives | Test benches for MT | Torque Converter Test Bench HAP07
HOME  |  COMPANY  |  NEWS  |  ARCHIVE  |  CAREER  |  SITEMAP  |  CONTACT  |  IMPRINT
© hofer 2007
kkCMS